Upgrade Guide
>
Post Upgrade Steps
Post Upgrade Steps
Upgrade Grafana Dashboards and CDRs
Applying a 3.6.5 License
ICE Single Node Server Post-Upgrade
A. Delete RallyPoint Servers
B. Delete Patch Servers:
C. Delete Static Reflectors:
D. Update Assigned Channel Defaults:
E. Update PBX Information:
F. Single Node Upgrade Completed
ICE Georedundant Server Post-Upgrade
A. Update RallyPoints
B. Update Assigned Channel Defaults
C. Update Patch Servers
D. Update Static Reflectors
E. Update PBX information
F. Fix Broken RallyPoint Connections
G. Georedundant Upgrade Completed
Ops Logs Synchronization Option
Apply the following instructions after completing the upgrade of your ICE Server to version 3.6.
This site works best with JavaScript enabled